               Imperial Irrigation District (IID) Proposes
         New Transmission for Southern California
                                          Dr. Raja Srivastava, Owner
               Renewable Engineering Consulting LLC , Established 2011                 
     916-757-8289 | email—rajamn2@renewableengineeringconsulting.com
                           www.renewableengineeringconsulting.com

Imperial Irrigation District, one of the five balancing authorities in California, has
recently announced addition of 230 KV and 500 KV transmission lines in Southern
California(1).

One of the reasons for this new transmission addition is to promote harvesting
renewable electricity from dense renewable resources in Southern California
particularly the Imperial Irrigation District service territories.

In addition to facilitating the renewable energy developments in California, the new
transmission lines will provide additional bandwidth to export renewable generation to
the CAISO energy market and to the load centers served by Arizona Public Service.

The key to success of your renewable developments in this competitive environment is
a winning strategy that distinguishes you from your competitors.  How do you come up
with such a winning strategy?  What do you base your winning strategy on?  
INFORMATION & INTELLIGENCE.  Can you design your winning strategy without
adequate information and intelligence?  You want the best information and
intelligence to arrive at the winning strategy.  Now you have a choice.

We offer you Experienced Resource, Flexible Resource and Low Cost Resource.
We have helped our clients with the following needs:
  • Site evaluation for the best interconnection to the grid?
  • Available transmission capacity evaluation?
  • Deliverability Assessment for your project site
  • How much will be the transmission interconnection cost?
  • Engineering data for your generation interconnection application & process;
  • How can I reduce the transmission interconnection cost?
  • Knowledge of generation interconnection process – Cluster Queue,
    Independent Study, Fast Track; pros and cons.
  • What will the study final report be like – proxy study and results?
  • Help with GIA and PPA
  • Post GIA process for interconnection
  • Project Management
  • Retainer Services
  • And the list goes on
.---------------------------------
1. http://www.iid.com/index.aspx?page=30&recordid=362&returnURL=%2Findex.aspx